Santak UPS

One of the highest-volume Chinese-market UPS brands — parts are easy to source, lead times are short, and the pricing is flexible.

Series we supply2

SeriesPowerTypeNotes
Santak ES series Santak ES series 1–3 kVA Online double-conversion (energy storage) 2U rack storage UPS, unity PF, UL/CE; external battery cabinets for runtime
Santak online UPS (Castle C / 3C series) 1–20 kVA Online double-conversion Small machine rooms, servers and network gear — sized to the load and runtime

Linked series open a full page with the model list, ratings and downloadable datasheets. Models not listed can also be supplied. Capacity and battery sizing should be calculated by an engineer against the actual load — never from the nameplate rating alone.

Where Santak fits

Santak has one of the largest installed bases in the small and mid power range across the Chinese market. Three practical reasons projects pick it:

  • Parts and batteries are easy to source — battery packs, network cards and rack kits have mature supply channels, so maintenance does not stall on a missing part.
  • Short lead times — high volume means common models can be sourced quickly; tight project schedules rarely wait weeks.
  • Flexible pricing — more grade options within the same power band, which helps when the budget is capped.

The trade-off: limited choice at the high-power, three-phase end. For machine rooms above tens of kVA we usually evaluate EATON three-phase models alongside Santak.

The common series

Series Topology Typical use
Castle C series (C1K–C10K) Online double-conversion Servers, network gear, small machine rooms — the workhorse range
3C series (3C10KS–3C40KS) Online, three-phase Higher-power machine rooms and production distribution
K / MT / TG series Standby / line-interactive Entry-level loads: workstations, POS, NVR

At the same VA rating, standby and online double-conversion protect very differently. Machine rooms, medical and production loads need an online model such as the Castle C series; standby units only suit non-critical loads on a stable supply.

What to confirm before buying

  1. Load profile and power factor. Nameplate VA and usable W diverge; motor and compressor loads need starting headroom.
  2. Runtime. This is decided by the battery bank, not the UPS — the same host with different batteries is a completely different proposal.
  3. Supply phases on site. Three-phase models such as the 3C series require three-phase distribution; single-phase sites cannot take them.

We supply the common Santak series with site survey, sizing, installation and maintenance. Sizing before quotation is free — send us the load list, site photos or the old unit's model number, and always confirm the full model number before purchase.

Call us WhatsApp quote